2012

Filtered generated 4 hits.

Sort on:

Relevance Date
  • 2012:56 Technical Note, Biosphere Dose Assessment: Review of Dose Consequence of Radionuclides in the Uranium-238 Series Decay Chain

    As part of the Swedish Radiation Safety Authority (SSM) initial phase review of the Swedish Nuclear Fuel and Waste Management Company (SKB) SR-Site safety assessment for a spent nuclear fuel repository in Sweden, this technical note documents Center for Nuclear Waste Regulatory Analyses (CNWRAÒ) review of potential effects on SKB dose calculations from radioactive elements associated with...

    Content type: Publications
  • 2012:49 Hydrogeological characteristics of sites for low- and intermediate-level waste disposal

    The Forsmark area with its selected two sites and the Laxemar-Simpevarp area with its two sites are broadly similar in terms of lithology, rock ages, and tectonic histories. The two areas differ in terms of degree of deformation, and tectonic fabric. Some lithologic and tectonic differences are noticeable between the two sites in the Forsmark area and between the two sites in the...

    Content type: Publications
  • 2012:42 Technical Note, Initial review of physical properties and processes of the buffer and backfill – Installation and initial state

    The technical note briefly summarises the proposed designs and functions of the buffer and backfill, and examines SKB’s progress in manufacturing, installing and testing its proposed solutions. In brief, the review suggests that there are some procedural and practical engineering aspects (e.g., quality assurance procedures, backfilling rates) and several physical processes to do with the...

    Content type: Publications
  • 2012:17 Technical Note, Corrosion of copper canister

    It is expected that the inflow of ground water to the deposition holes and tunnels in the Forsmark repository will be very slow. Thus, it might take some few hundred years up to thousand years before the deposition holes are filled with ground water and it might take 6000 years or more before the bentonite buffer is fully water saturated and pressurized. The copper canisters will therefore...

    Content type: Publications