Filtered generated 254 hits.
-
2010:46 Development of the PRO-LOCA Probabilistic Fracture Mechanics Code, MERIT Final Report
The MERIT project has been an internationally financed program with the main purpose of developing probabilistic models for piping failure of nuclear components and to include these models in a probabilistic code named PRO-LOCA. The principal objective of the project has been to develop probabilistic models for piping failure of nuclear components and to include these models in a...
Content type: Publications -
2010:22 Research and Development Program in Reactor Diagnostics and Monitoring with Neutron Noise Methods, Stage 16
This report constitutes Stage 16 of a long-term research and development program concerning the development of diagnostics and monitoring methods for nuclear reactors. Results up to Stage 15 were reported in SKI and SSM reports, as listed below and in the Summary. The results have also been published in international journals and have been included in both licentiate- and doctor’s degrees.
Content type: Publications -
2010:45 Evaluation of models for cyclic plastic deformation – A literature study
Analysis of nuclear components subjected to cyclic plastic deformation is normally based on the American standard ASME III. With the focus to improve the modeling of the stress-strain response under non-monotonic loading, several models for the analysis of cyclic plastic deformation have been developed in recent years. However, experience shows that the analysis and evaluation of plastic...
Content type: Publications -
2010:42 Using the EPRI Risk-Informed ISI Methodology on Piping Systems in Forsmark 3
In the SSM regulation SSMFS 2008:13, it is stated that the selection of locations for inspection of mechanical components shall be based upon the risk for core damage or the risk of release of radioactive substances. Both qualitative and quantitative measures of the relative risk are allowed to be used. So far only the PWRs in Sweden are using a quantitative procedure to evaluate the risk...
Content type: Publications -
2010:16 Guidance to Risk-Informed Evaluation of Technical Specifications using PSA
No guidance documents for risk-informed analysis and assessment of changes in Limiting Conditions for Operation (LCO:s) in TS (Technical Specifications) have been available in the Nordic countries. In the U.S. several guidance documents, primarily developed by the owners groups for PWRs and BWRs, exist. Guidance for analysis of TS changes in this report generally follows the U.S. Regulatory...
Content type: Publications -
2010:07 Indicators of safety culture – selection and utilization of leading safety performance indicators
Safety indicators play a role in providing information on organizational performance, motivating people to work on safety and increasing organizational potential for safety. The aim of this report is to provide an overview on leading safety indicators in the domain of nuclear safety. The report explains the distinction between lead and lag indicators and proposes a framework of three types of...
Content type: Publications -
2010:01 Licensing of safety critical softwarefor nuclear reactors
It is widely accepted that the assessment of software cannot be limited to verification and testing of the end product, i.e. the computer code. Other factors such as the quality of the processes and methods for specifying, designing and coding have an important impact on the implementation. Existing standards provide limited guidance on the regulatory and safety assessment of these factors.
Content type: Publications -
00:48 The Use of Risk Based Methods for Establishing ISI-Priorities for Piping Components at Oskarshamn 1 Nuclear Power Station
Björn Brickstad SKI English...
Content type: Publications -
2009:38 Research and Development Program in Reactor Diagnostics and Monitoring with Neutron Noise Methods, Stages 14 and 15
This report constitutes Stages 14 and 15 of a long-term research and development program concerning the development of diagnostics and monitoring methods for nuclear reactors. Stage 14 was a full one-year project, whereas Stage 15 consisted of a half-year project. Results up to Stage 13 were reported in SKI reports, as listed below and in the Summary. The results have also been published in...
Content type: Publications -
2009:27 Analysis Strategy for Fracture Assessment of Defects in Ductile Materials
SSM has supported research for investigating the role of secondary stresses when fracture assessments are performed for cracked structures made of ductile materials. There are evidences that indicate that some secondary stresses, such as weld residual stresses, are not as important as primary stresses for estimating the safety margin against rupture (measured by the J-integral) for the type...
Content type: Publications