Filtered generated 275 hits.
-
2007:23 On Safety Management, A Frame of Reference for Studies of Safety Management with Examples From Non-Nuclear Contexts of Relevance for Nuclear Safety
The authors present the theoretical framework. There they also discuss the pros of using the system perspective to build a useful frame of reference of safety management using non- nuclear organizations; this as a way to create models useful for the nuclear power industry but based on general understanding of the concept of safety management. The chosen organizations are used extensively to...
Content type: Publications -
2007:22 Safety Management An Introduction to a Frame of Reference Exemplified with Case Studies from Non-Nuclear Contexts
A systems perspective has been applied on safety management that will be the foundation for the frame of reference the authors intend to build during the three-year long project. The case studies are presented and form illustrations of both high quality safety management and weaknesses of the safety management and take a look at information feedback about the risks of the systems. An...
Content type: Publications -
2007:09 DECOVALEX-THMC - Task C
This report describes the results of Task C1 of the international DECOVALEX– THMC project devoted to Excavation Damage Zone (EDZ) in argillaceous rock at the Tournemire site in France. Task C of the project is aimed to understand the physical phenomena induced by excavation in the argillaceous rock. The task is to develop adequate numerical models for interpretation of observed damaged zones...
Content type: Publications -
2007:02 Stakeholder involvement in Swedish nuclear waste management
This report have attempted to show the development of stakeholder involvement in the siting of a final repository for Sweden’s spent nuclear fuel as resembling something other than a straightforward linear process of improvement and refinement. Stakeholder involvement has developed, over the past 15 years or so, in something more like a patchwork of different shapes and forms. Some of the...
Content type: Publications -
2007:04 Link Between RI-ISI and Inspection Qualification: Relationship between Defect Detection Rate and Margin of Detection
A relationship has been established between defect detection ratio and margin of detection based on blind trails. The results are based on a rather small amount of data produced by personnel from one inspection laboratory but give us indications of how signal to noise ratio is possible to relate to the probability of detection (POD) used in RI-ISI models. The relationship need to be developed...
Content type: Publications -
2007:08 DECOVALEX-THMC - Task B
This report summarizes the work contributed to Phase 2 of Task B of the international DECOVALEX-THMC project, which took place during the period of March 2004 to May 2006. The Phase 2 work incorporated the use of a wide range of numerical models to simulate the failure of a number of intact rock core samples, from the APSE tunnel at Äspö HRL, as tested in uniaxial compression and other...
Content type: Publications -
2007:17 Spent Fuel Dissolution and Source Term Modelling in Safety Assessment
SKI is preparing to review the license applications being developed by the Swedish Nuclear Fuel and Waste Management Company (SKB) for a final repository for the geological disposal of spent nuclear fuel (SFL-2) in the year 2009. As part of its preparation, SKI is conducting a series of technical workshops on key aspects of the Engineered Barrier System (EBS) and spent fuel. This workshop...
Content type: Publications -
2007:19 An Applied Study of Implementation of the Advanced Decommissioning Costing Methodology for Intermediate Storage Facility for Spent Fuel in Studsvik, Sweden with special emphasis to the application of the Omega code
The aim of this applied study has been to describe in a systematic way an appropriate methodological sequence for cost estimation of crucial parameters in decontamination and decommission processes. The work has been limited to older nuclear installations and facilities. Furthermore, it may be envisaged that the process of estimating the parameters of decommissioning is one of the main issues...
Content type: Publications -
2007:05 Development of an Input Model to MELCOR 1.8.5 for Oskarshamn 3 BWR
200 Lars Nilsson SKI English...
Content type: Publications -
2007:06 Probabilistic Safety Goals - Phase 1 -Status and Experiences in Sweden and Finland
Based on a series of interviews and on literature reviews as well as on a limited interna- tional over-view, the project has described the history and current status of safety goals in Sweden and Finland. A number of issues were discussed more in detail, including the status of the safety goals in view of the fact that they are often exceeded, strategies for handling violations of safety...
Content type: Publications