2003:09 Operational Readiness Verification, Phase 2: A Field Study at a Swedish NPP during a Productive-Outage
2003
2003:09 Operational Readiness Verification, Phase 2: A Field Study at a Swedish NPP during a Productive-Outage
Author:
Erik Hollnagel, Vincent Gauthereau
Publisher:
SKI
Publication date:
2003-01-01